1. Excavate area to be re constructed to a depth of 175mm and dispose to tip. No skips will be used.
2. Lay Terram membrane over excavated area.
3. Supply, lay and compact 100mm of MOT Type 1 crushed limestone as a sub base.
4. Sweep in kiln dried sand and compact.